🛍️ Shoppers
👀Online Now
🔥 Let’s finish strong!

🔥 See other categories in this collection! 🔥

Vesgantti Full Size Mattress, 10 Inch Innerspring Hybrid Full Mattress in a Box, Pressure Relief Pocket Spring Double Bed Mattress with Memory Foam & Knitted Fabric, Medium Firm, CertiPUR-US

Sale price $129.99 Regular price $159.99
VIEW ON AMAZON


🛍️ Shoppers
👀Online Now

Availability & Shipping

  • Product availability: This is a US based website and some products may not be available outside the US.
  • Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
  • Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.

Transparency

  • Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.

🔥 Newsletter 🔥

Sign up for exclusive offers, new items, and more.

Description

Brand: Vesgantti

Color: Grey

Features:

  • 【Medium Firm Plush Feel】Full bed mattresses are fully expanded 75*54*10 inch(LWH) approax. Vesgantti luxury mutilayer foam and pocket spring support systerm of mattress full size bed provide medium firm yet comfortable feelwhich will protect and support your lumbar vertebra and back from pain. Boxed mattress full size fits most bedframe types except adjustable frame.
  • 【Individual Pocket Spring】Innovative zoned spring support system with ergonomic design of full bed mattress is constructed by hundreds of individual pocketed stainless spring coils. Each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture.
  • 【Breathable and Healthy】This double mattress is designed with multi-layer foams and pocket spring which increasing good air circulation and breathability. It keeps body comfortable and dry and provides a cooler sleeping environment. This double bed mattress contains no fiberglass, which means a healthier sleep environment.
  • 【Ultra Quite】Due to the pocket spring and multilayer foams design, this innerspring mattress can effectively absorb noise and vibration. So you won't be disturbed by any tossing and turning from your partner and enjoy a peaceful and comfortable sleep.This full size bed mattresses can support weight up to 250 lbs.
  • 【Full Size Mattress in a Box】Our mattress full is compressed, rolled, and shipped in a box for ultimate convenient delivery to your door. For a better sleeping experience, please wait 72 hours for the mattress to fully expand. You can contact the Vesgantti support team if you have any problems. (Cautions: Make sure no one is standing at the direction where the mattress is rolling out to prevent any unnecessary injury. Once the mattress open and restore, it cannot be rolled back again.)

EAN: 0304369019025

Binding: Kitchen

Part Number: R903006

model number: R903006

CraftPath Preview

Explore CraftPath

Your complete journey from learning to creating — watch tutorials, read guides, shop curated collections, and get inspired by finished projects.

Explore CraftPath

Why they love us!

Shopping on WoodArtSupply is a breeze everything is beautifully organized and easy to find, making my creative process smoother from the start.

Jennifer

Jen's Boutique

After feeling unsure about a product, WoodArtSupply's support team guided me patiently and clearly making me feel confident and well taken care of.

Ben

Ben on Etsy

WoodArtSupply offers the best selection of products I’ve seen. Every tool, material, and accessory I need is right at my fingertips, making creativity effortless.

Salazar

Sal Paints

×