🔥 See other categories in this collection! 🔥
Bed Frames
Bunk & Loft Beds
Night Stands
Coffee Tables
Conference Tables
Table Sets
Standing Desks
Gaming Desks
Computer desks
Vanity Desks
Dressers
Chairs
Storage Cabinets
Benches
Egg Chairs
Wooden Ottomans
Bathroom Storage
Canopy Beds
Lounge Chairs
Futons
Cribs
Carts
Couches & Sofas
Beds
Recliners
Reception Desks
Murphy Beds
Massage Chairs
70" Sofa Living Room Couch, Velvet Deep Couches for Small Spaces, Mid Century Modern Loveseat with Storage Bag, Bedroom, Apartment, Office, Removable Sofa Cover Spring Cushions, Fast Assembly, Grey
4% off
4% off
Sale price
$219.99
Regular price
$229.99
Unit price
/
Unavailable
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Brand: Vesgantti
Color: Grey
Features:
- Cloud-like Comfort: Sitting on this deep seated couch feels like being enveloped in a cloud, providing a soft, leisurely experience as your entire body is gently supported. The elastic support for your back and lumbar regions makes it the perfect spot for relaxation.
- Premium Materials: Upholstered in skin-friendly and breathable velvet fabric, this loveseat sofa offers a luxurious feel and exceptional comfort. The cushions are filled with high-quality cotton, ensuring they remain plump and supportive with a thickness ranging between 6.69 to 7 inches.
- Unique Design: The sofa for living room features smooth, flowing curves that blend elegance with a touch of creativity. Pillow-shaped armrests with side storage pockets offer a dual-purpose function, providing support for your upper body and reducing fatigue from prolonged sitting. When lying down, these armrests can serve as pillows to support your head comfortably.
- Durable and Sturdy: The seat cushions feature built-in spring packs, ensuring durability and resistance to deformation. They provide excellent support and elasticity, helping to prevent back and waist pain from prolonged sitting. With a thickness of 6.69 inches, the cushions offer a cloud-like softness and resilience.
- Easy Assembly: Our sofa furniture comes in a single package with minimal assembly tools required. Installation can be completed in just 4 steps. After 48 hours, the sofa cushions will regain their optimal elasticity. Start your lazy leisure time!
- Removable Sofa Covers: The sofa covers are detachable and washable. For best results, hand wash in cool water and air dry naturally; do not use high-temperature water or tumble dry.
- Tips: Due to the vacuum packing of our sofas, the cushions and backrests may take a while to return to their original shape after a long period of compression and transportation. Please don't worry. To speed up the expansion, you can use the following methods to help the sofa recover as soon as possible: gently pat the cushions and backrests to allow air in and speed up the fluffiness. Place the sofa outside or near a window so that it can enjoy the sunlight, which helps to restore the fluffiness of the fibers. For creases, you can use a steam iron to help bring it back to flatness as quickly as possible
Binding: Kitchen
Part Number: Grey loveseat
model number: Loveseat





