🔥 See other categories in this collection! 🔥
Bed Frames
Bunk & Loft Beds
Night Stands
Coffee Tables
Conference Tables
Table Sets
Standing Desks
Gaming Desks
Computer desks
Vanity Desks
Dressers
Chairs
Storage Cabinets
Benches
Egg Chairs
Wooden Ottomans
Bathroom Storage
Canopy Beds
Lounge Chairs
Futons
Cribs
Carts
Couches & Sofas
Beds
Recliners
Reception Desks
Murphy Beds
Massage Chairs
Vesgantti 65" Beige Loveseat, Comfy Mid-Century Modern 2-Seat Sofa, No-Tool Assembly Small Couch for Living Room & Bedroom
Regular price
$219.99
Unit price
/
Unavailable
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Brand: Vesgantti
Color: Beige
Features:
- Unmatched Comfort and Support: Vesgantti loveseat sofa offers unparalleled comfort with independently wrapped coils and high-density foam cushions that conform to your body. Enjoy blissful comfort with our thoughtfully designed back cushion. Relax and unwind in style.
- Sturdy and Durable: Vesgantti 2-seater loveseat sofa is crafted for long-lasting use. With solid wood legs and a reinforced frame, it offers unparalleled stability. Features improved polyester fiber and independently wrapped coils for enhanced comfort and durability. Supports up to 700lbs (317kg).
- Versatile and Space-Saving: Vesgantti 2-Seat Loveseat (65" W x 29.5" D x 34.8" H) embraces mid-century modern design. Ideal for small apartments and cozy corners, its compact size fits seamlessly into any area while maximizing seating. Enhance your space with this functional and stylish loveseat, designed to make a statement and optimize your living area.
- No-tool installation: Designed for easy setup without extra tools. Find all necessary accessories inside the seat frame by unzipping the black cloth at the bottom. Follow the instructions to assemble the sofa in 15-20 minutes. If any accessories are missing or other issues, contact us promptly. Allow 2-3 days for back and seat cushions to fully expand.
- Service: Enjoy peace of mind with our 2-year support. Please note that colors may appear slightly different depending on lighting or device settings; allow for color variations under different lighting conditions.
Part Number: CAN0USM-JJS078HUA1A-6d
model number: CAN0USM-JJS078MIA1A-02





