🔥 See other categories in this collection! 🔥
Christmas Decor
Dog Crates
Catios
Cat Box Enclosure
Drafting Tables
Farmhouse Furniture
Ceiling Fans
Bamboo Blinds
Curio Cabinets
Wardrobes & Armoires
Shoe Racks
TV Stands
Bookshelves
Console Table
Kitchen Pantry & Storage
Work Benches
Bar Tables
Garage Storage
Kitchen Islands
Fish Tank Stands
Liquor Displays
Electric Grooming Tables
Shower Benches
Coat Racks
Printer Stands
Bakers Racks
Gun Safes
Farmhouse Decor
Personalized Gifts
Kitchen Tools
Electric Fireplaces & Mantels
Record Player Stands
Kitchen Supplies
Pet Memorial Keepsakes
Ginchain Garage Slatwall Panel Wall Organizer - Slat Wall Paneling Sheets with Hooks, Interlocking PVC Panels for Tool Organization Mounted Storage Systems
Regular price
$99.99
Unit price
/
Unavailable
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Brand: Ginchain
Color: White
Features:
- Kit Includes: 4 x Slats(Each 12 x 48 In), 4 x J Trim Edging, Screws with drill bit, 8 x Hooks and Instructions. Providing coverage area of 4ft by 4ft (16 square feet total)
- Universal Storage Solutions: Achieve an organized and efficient space with slat wall panels that seamlessly adjusts to various environments, delivering the ideal storage solution for every room, overcome storage obstacles, installation is straightforward, offering an efficient way to organize your space
- Superior Slatwall: Slat wall paneling system constructed from robust commercial-grade PVC. Resistant to UV rays, stains, fire, chemicals, and oils, durability and immune to wear and tear. Say goodbye to fading, drying, cracking, and damage from water or moisture
- Modular Customized: Slatwall panel features T-Channel design for easy adjustment of hooks and accessories. Change your configuration or add to it at any time, customize or expand storage to create personalized storage solutions, H-trim and F-trim in kit complete a seamless side-by-side connection
- Multiple Options: Slatwall comes in White & Grey and many sizes and configurations as needed, conveniently store tools or create attractive displays in all sections of PVC wall panels. Quickly creater your ideal garage slat wall storage systems
model number: 004







