🔥 See other categories in this collection! 🔥
Fine Woodworking's Roubo Bench with Bench Crafted Vises Plan (Fine Woodworking Project Plans)
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Author: Miller, Jeff
Brand: Taunton Press
Edition: Illustrated
Binding: Misc. Supplies
Format: Illustrated
Number Of Pages: 1
Release Date: 11-10-2012
Details: When Jeff Miller built a small bench to test two new vises from BenchCrafted, little did he realize that he would love the vises so much, he’d soon build a full-size bench to live up to their potential. Both the leg vise and wagon vise hold more securely and are easier to adjust than any other vises he has used. So to showcase these powerhouses, he built this modified Roubo bench with a beefy base, a heavy top, and blocky legs flush to the front edge of the benchtop. SKILL LEVEL: Intermediate DIMENSIONS: 84 in. long by 24-1/2 in. wide by 35-1/2 in. high. WHAT'S INCLUDED: Scale drawings Detailed cutlist Step-by-step companion article
EAN: 9781621137924
Package Dimensions: 12.4 x 9.1 x 0.4 inches
Languages: English

