Novilla Twin Mattress, 10 Inch Hybrid Mattress in a Box, Gel Inflation Memory Foam with Pocket Coils Innerspring for a Cozy Night, Pillow Top Twin Size Mattress, Medium Firm & Fit The Body's Curves

Regular price $162.76
View Current Price


Availability & Shipping

  • Product availability: This is a US based website and some products may not be available outside the US.
  • Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
  • Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.

Transparency

  • Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.

🔥 Newsletter 🔥

Sign up for exclusive offers, new items, and more.

Description

Brand: Novilla

Color: White&green

Features:

  • 3-ZONED ERGONOMIC DESIGN IDEAL FOR ANY SLEEPING POSITION - The Novilla twin size hybrid mattress is designed with three-zone precision support technology for all sleeping positions, effectively easing points of pressure and enhanced support from the head to toe, assisting with your spinal alignment. Whether you are a back, side, or stomach sleeper, you can experience the proper tension-free alignment with this 10-inch hybrid mattress.
  • KEEP ING and BALANCED SUPPORT - Our 10-inch spring mattress utilizes a 3-layer foam design, including gel memory foam and supportive foam. It features soothing and effective weight-bearing support, is sturdy and durable, and absorbs moisture. This twin hybrid mattress conforms to the human curve, providing comfort and softness while improving blood circulation to relax the entire body as you enjoy sleep.
  • MOTION ISOLATION FOR UNDISTURBED SLEEPING - The Novilla 10 inch twin mattress features an individual pocket coils spring system features a silent design that effectively reduces tossing and turning, allowing you to enjoy a peaceful and comfortable sleep condition. It balances your body weight, keeps spinal health, and relieves pains. This twin size mattress always gives you a quieter and deeper sleep experience.
  • SUITABLE FOR MOST BASES AND FRAMES - The 10" twin-size pillow top hybrid mattress measures 75" L x 39" W x 10" H, which is compatible with most bed frames, you can even place the mattress on the floor directly without a frame. Unbox the mattress and let it inflate for about 72 hours for full expansion.
  • HYBRID MATTRESS WITH MEDIUM FIRMNESS - Novilla spring mattress queen is medium firm touching with a 100-night sleep trial. Should you encounter any issues, please contact our customer support team at any time.

Details: Novilla Hybrid Mattress - A COZY HOME MADE SIMPLE!

Why choose Novilla Hybrid mattress?

Clean, Dry, and Comfortable Sleep experience - Hybrid helps regulate moisture, temperature, and odors, and can guarantee a clean and restful sleep environment.

Edge Support - Hybrid offers good edge support, no worry about sinking or rolling off while you sit on the mattress edge.

Ideal For Any Sleeping Positions - 3 zoned ergonomic design helps eliminate pressure points, balances support from head to toe, and offers quality sleep.

CertiPUR-US Certified - The Hybrid infused is CertiPUR-US certified, it is safe and provides you and your family a healthy sleep.

No Risk - 100-night sleep trial and 10-year limited warranty, shop from Novilla with confidence.

What is inside the box?

1x Novilla 10 inch twin Hybrid mattress

1x Novilla mattress opener

1x Novilla manual card

Warm reminder:

A slight odor from the new mattress is harmless and will dissipate after a short time.

Everyone has their own view of firmness. We recommend giving your new Novilla mattress a chance to be used to your sleep position within a few weeks. If you still can't sleep well, please contact us freely at any time, we are always on standby to assist you.

Please Give your Novilla mattress 72 hours at least to fully expand to its original shape.

Binding: Kitchen

Part Number: NV0M807B-10-T

model number: NV0M807B-10-T

Why they love us!

Shopping on WoodArtSupply is a breeze everything is beautifully organized and easy to find, making my creative process smoother from the start.

Jennifer

Jen's Boutique

After feeling unsure about a product, WoodArtSupply's support team guided me patiently and clearly making me feel confident and well taken care of.

Ben

Ben on Etsy

WoodArtSupply offers the best selection of products I’ve seen. Every tool, material, and accessory I need is right at my fingertips, making creativity effortless.

Salazar

Sal Paints