Vesgantti California King Mattress 12 Inch Innerspring Multilayer Hybrid Cal King Size Mattress - Ergonomic Design with Memory Foam and Pocket Spring Mattress - Box Top Series Medium Firm Feel
7% off
7% off
Sale price
$259.99
Regular price
$279.99
Unit price
/
Unavailable
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Brand: Vesgantti
Color: White and Blue
Features:
- 【Vesgantti Hybrid Mattress】Vesgantti luxury multilayer foams and pocket springs support systerm provide all-round support for 7 parts of your body, while also make your body better release pressure, offering a balanced sleep experience for all sleepers.
- 【Ultra Quiet】The hybrid mattress has built in hundreds of high quality independent pocket springs with excellent shock absorption and resilience, better motion isolation and lower noise, helping you to sleep peacefully.
- 【Breathable and Healthy】Designed with comfortable and breathable multi-layer foams, our mattress provides good air circulation and dissipates sweat or moisture to keep your body comfy and dry when you are asleep.
- 【Quality Sleep】Vesgantti hybrid mattress offers a medium firm feel and meets most people's sleep preferences, not too hard not too soft. You can enjoy a comfortable sleep every night by using our mattress.
- 【Mattress in a Box】Vesgantti mattresses are compressed, rolled and shipped in a box, you can easily move it and set it up in your room. Note: When unwrapping the mattress, be sure to keep a safe distance, as it may expand quickly.
EAN: 0840325600185
Part Number: Box Top 1
model number: Box Top Mattress





