Vesgantti Full Size Mattress, 10 Inch Hybrid Full Mattress in a Box, Double Mattress with Memory Foam and Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel, 54"*75"*10"

Sale price $189.99 Regular price $219.99
View Current Price


Availability & Shipping

  • Product availability: This is a US based website and some products may not be available outside the US.
  • Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
  • Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.

Transparency

  • Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.

🔥 Newsletter 🔥

Sign up for exclusive offers, new items, and more.

Description

Brand: Vesgantti

Color: Black and White

Features:

  • Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Vesgantti Luxury Support System: Luxury multi-layer foam and pocket spring support system not just provides better support for your body, but also can absorb more pressure come from your body and the spring, providing more buffers for your body. Fully relax your muscles, greatly improve your sleeping quality
  • Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, comfortable and breathable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, restore in 10 seconds after unpacking. Please note: once the mattress open and restore, it cannot be roll back again

Details: Vesgantti Sleeping - we are always trying to provide better service and product for all our customers with better price. Every mattress is elaborately designed to offer comfort and support and pressure for the demand of all your families.

The Internal Structure 
● Luxury thick knit fabrics made by cotton and polyester, soft and breathable, anti-fire with US standard 
● Polypropylene cotton
● Egg-shaped massage foam
● Slow springback foam
● Breathable non-woven fabrics
● High-density support foam
● Solid-quality cotton and blanket 
● Individual Pocket Sprung 
● Solid-quality cotton and blanket 
● Strong bottom polyester cover fabric

Multilayer Foam and Pocket Spring Support System
Special box top design - this Box top mattress has many layer of different density foam, the higher density foam can provide more support for your body while the low density foam can observe more pressure. Combining with the sprung system at the bottom which can distribute more weight pass through the foam layers, this multilayer foam and pocket spring system will perfectly offer you a comfort sleeping feeling.

How to protect the mattress  
Rotate the mattress normally too keep the springs and foam in good condition.
Do not jump on the mattress and keep good ventilation.
Recommend to use mattress protector or mattress cover

Please Note: 
Different people has different feeling on sleeping, some may feel too hard some may feel too soft, and it also depend on the weight of different people. So it is hard for us to make our mattress to be all things to all people. If you have any problem with our product, please don't hesitate to let us know and we will try our best to help you.

EAN: 0687345773129

Binding: Home

Part Number: full size mattress

model number: full size mattress

Why they love us!

Shopping on WoodArtSupply is a breeze everything is beautifully organized and easy to find, making my creative process smoother from the start.

Jennifer

Jen's Boutique

After feeling unsure about a product, WoodArtSupply's support team guided me patiently and clearly making me feel confident and well taken care of.

Ben

Ben on Etsy

WoodArtSupply offers the best selection of products I’ve seen. Every tool, material, and accessory I need is right at my fingertips, making creativity effortless.

Salazar

Sal Paints