Vesgantti Queen Mattress, 12 Inch Hybrid Queen Mattress in a Box, Queen Bed Mattress with Memory Foam and Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel, 60"*80"*12"

Regular price $269.99
View Current Price


Availability & Shipping

  • Product availability: This is a US based website and some products may not be available outside the US.
  • Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
  • Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.

Transparency

  • Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.

🔥 Newsletter 🔥

Sign up for exclusive offers, new items, and more.

Description

Brand: Vesgantti

Color: Black and White

Features:

  • Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Vesgantti Luxury Support System: Luxury multi-layer foam and pocket spring support system not just provides better support for your body, but also can absorb more pressure come from your body and the spring, providing more buffers for your body. Fully relax your muscles, greatly improve your sleeping quality
  • Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, comfortable and breathable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, restore in 10 seconds after unpacking. Please note: once the mattress open and restore, it cannot be roll back again

Part Number: queen mattress

model number: queen mattress

Why they love us!

Shopping on WoodArtSupply is a breeze everything is beautifully organized and easy to find, making my creative process smoother from the start.

Jennifer

Jen's Boutique

After feeling unsure about a product, WoodArtSupply's support team guided me patiently and clearly making me feel confident and well taken care of.

Ben

Ben on Etsy

WoodArtSupply offers the best selection of products I’ve seen. Every tool, material, and accessory I need is right at my fingertips, making creativity effortless.

Salazar

Sal Paints