Vesgantti Queen Mattresses, 10 Inch Hybrid Queen Size Mattress in a Box, Pillow Top Queen Bed Mattress, Gel Memory Foam Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Plush Feel

Sale price $229.99 Regular price $299.99
View Current Price


Availability & Shipping

  • Product availability: This is a US based website and some products may not be available outside the US.
  • Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
  • Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.

Transparency

  • Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.

🔥 Newsletter 🔥

Sign up for exclusive offers, new items, and more.

Description

Brand: Vesgantti

Color: White

Features:

  • 【Medium-Firm Plush Feel】- Fully expanded 80* 60*10 inch(LWH) approx. Vesgantti luxury mutilayer foam and pocket spring support systerm provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains
  • 【Individual Pocket Spring】- Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
  • 【Breathable and Healthy】- Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
  • 【Ultra Quite】- Due to the pocket spring + multilayer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
  • 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Make sure no one is stanting at the direction where the mattress is rolling out to prevent any unnecessary injury. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)

Details: Vesgantti Sleeping - we are always trying to provide better service and product for all our customers with better price. Every mattress is elaborately designed to offer comfort and support and pressure for the demand of all your families. How to protect the mattress ● Rotate the mattress normally too keep the springs and foam in good condition. ● Do not jump on the mattress and keep good ventilation. ● Recommend to use mattress protector or mattress cover Please Note: Different people has different feeling on sleeping, some may feel too hard some may feel too soft, and it also depends on the weight of different people. So it is hard for us to make our mattress to be all things to all people. If you have any problem with our product, please don’t hesitate to email us and we will try our best to help you.

EAN: 4789152083234

Binding: Kitchen

Part Number: mattress

model number: medium firm mattress

Why they love us!

Shopping on WoodArtSupply is a breeze everything is beautifully organized and easy to find, making my creative process smoother from the start.

Jennifer

Jen's Boutique

After feeling unsure about a product, WoodArtSupply's support team guided me patiently and clearly making me feel confident and well taken care of.

Ben

Ben on Etsy

WoodArtSupply offers the best selection of products I’ve seen. Every tool, material, and accessory I need is right at my fingertips, making creativity effortless.

Salazar

Sal Paints