Vesgantti Twin Mattress, 10 Inch Twin Size Hybrid Mattress in a Box, Twin Bed Innerspring Mattress with Gel Memory Foam and Pocket Coils Spring, Tight Top Series Medium Firm Feel
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Brand: Vesgantti
Color: White
Features:
- Medium-Firm Feel: Fully expanded 75*39*10 inch(LWH) approx. Vesgantti luxury multi-layer foam and pocket spring support system provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Individual Pocket Spring: Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- Breathable and Healthy: Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- Ultra Quite: Due to the pocket spring + multi-layer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- Vacuum Rolled Packed: Vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. Please note: once the mattress open and restore, it cannot be roll back again
Details: Vesgantti Sleeping - we are always trying to provide better service and product for all our customers with better price. Every mattress is elaborately designed to offer comfort and support and pressure for the demand of all your families.
How to protect the mattress
● Rotate the mattress normally too keep the springs and foam in good condition.
● Do not jump on the mattress and keep good ventilation.
● Recommend to use mattress protector or mattress cover
Please Note:
Different people has different feeling on sleeping, some may feel too hard some may feel too soft, and it also depends on the weight of different people. So it is hard for us to make our mattress to be all things to all people. If you have any problem with our product, please don't hesitate to email us and we will try our best to help you.
EAN: 4789152083135
Binding: Kitchen
Part Number: Twin mattress
model number: twin mattress






