Vesgantti Twin Mattress 12 Inch Innerspring Multilayer Hybrid Single Mattress - Ergonomic Design with Memory Foam and Pocket Spring Mattress Twin Size - Box Top Series Medium Firm Feel

Regular price $219.99
View Current Price


Availability & Shipping

  • Product availability: This is a US based website and some products may not be available outside the US.
  • Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
  • Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.

Transparency

  • Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.

🔥 Newsletter 🔥

Sign up for exclusive offers, new items, and more.

Description

Brand: Vesgantti

Color: White and Blue

Features:

  • 【Vesgantti Hybrid Mattress】Vesgantti luxury multilayer foams and pocket springs support systerm provide all-round support for 7 parts of your body, while also make your body better release pressure, offering a balanced sleep experience for all sleepers.
  • 【Ultra Quiet】The hybrid mattress has built in hundreds of high quality independent pocket springs with excellent shock absorption and resilience, better motion isolation and lower noise, helping you to sleep peacefully.
  • 【Breathable and Healthy】Designed with comfortable and breathable multi-layer foams, our mattress provides good air circulation and dissipates sweat or moisture to keep your body comfy and dry when you are asleep.
  • 【Quality Sleep】Vesgantti hybrid mattress offers a medium firm feel and meets most people's sleep preferences, not too hard not too soft. You can enjoy a comfortable sleep every night by using our mattress.
  • 【Mattress in a Box】We make it easy to transport the mattress, Vesgantti mattresses are compressed, rolled and shipped in a box. Note: Please wait 48-72 (or more) hours for the mattress to fully unfold before using it.

Details: 1. Natural Knitted Fabric 2. Anti-fire Foam Layer 3. Memory Foam Layer 4. Ventilation Foam Layer 5. Comfortable Foam Layer 6. Independent Spring System 7. High Density Base

EAN: 0840325600130

Part Number: Box Top 1

model number: Box Top Mattress

Why they love us!

Shopping on WoodArtSupply is a breeze everything is beautifully organized and easy to find, making my creative process smoother from the start.

Jennifer

Jen's Boutique

After feeling unsure about a product, WoodArtSupply's support team guided me patiently and clearly making me feel confident and well taken care of.

Ben

Ben on Etsy

WoodArtSupply offers the best selection of products I’ve seen. Every tool, material, and accessory I need is right at my fingertips, making creativity effortless.

Salazar

Sal Paints