Winsome Suzanne 3-PC Set Space Saver Kitchen, Coffee Finish, 29.61x29.13x32.76
Winsome Suzanne 3-PC Set Space Saver Kitchen, Coffee Finish, 29.61x29.13x32.76 is backordered and will ship as soon as it is back in stock.
Availability & Shipping
Availability & Shipping
- Product availability: This is a US based website and some products may not be available outside the US.
- Shipping info: The majority of items have free shipping, but some products due to size or shipping location may have a shipping fee.
- Our Supporting Artisans who helped curate the products on this site will share commissions for purchases made through links in this post.
Transparency
Transparency
- Transparency: Unfortunately due to high levels of fraud committed on this shop our team has decided to only work with trusted suppliers to bring you the high quality items and fast shipping you've been used to from now on.
🔥 Newsletter 🔥
Sign up for exclusive offers, new items, and more.
Description
Description
Brand: Winsome
Color: Coffee Finish
Features:
- Dimensions (W x D x H): 29.61 in x 29.13 in x 32.75 in
- Drop Leaf to expand table size | Stools tuck neatly under the table
- Set rolls easily on casters
- Two drawers with cut-out handles
- Made of Solid and Composite Wood
- Included Components: Table, Stools
Details: This inviting 3-Piece Space Saver Set will bring ease and versatility to dining in your kitchen, breakfast nook, or den. A drop leaf supported by a swing-away leg with a 5th rolling caster can be opened to create a dining table for two. Or lower the drop leaf, stow the stools, and roll the unit into the corner to create more open space. The sturdy hideaway stools have smooth, broad seat tops with rounded corners and can be tucked neatly under the table for a compact footprint. Two drawers with cut-out handles are ideal for silverware, napkins, and placemats. And the push handle also serves as handy place to hang a kitchen towel. Rolling casters, two of which lock to keep the unit stable while in use, allow for easily mobility. Made of solid and composite wood in a sleek Coffee Finish. Table Height: 32.75"H Tabletop dimensions (with leaf open): 27.3"W x 29.6"D (with leaf lowered): 27.3"W x 15.4"D Push handle adds 2.25" to overall width Drop leaf dimensions: 27.3"W x 14.8"D Table thickness: .75" Static weight capacity of table (evenly distributed): 100 lbs. (leaf closed); 75 lbs. (leaf open) Stool overall dimensions: 11.5"W x 11.5"D x 20.8"H Stool leg footprint: 9.6"W x 9.6"D Static weight capacity for each stool: 200 lbs. Assembly required Ships in 1 box
EAN: 0021713233301
Release Date: 02-05-2018
Binding: Kitchen
Part Number: 23330
model number: 23330














